Total Project Solutions Design-Build
“Total Project Solutions” Design-Build
strategy places the responsibility for both the design and the construction
on us for any given project. The benefits of the design-build approach
outweigh any risks we might assume. Collaboration between designers
and contractors results in a more effective project team ensuring
on-time delivery and saving the owner money. The budget is delivered
at the beginning of the project and no inconvenient change order
surprises appear during the construction phase. Valuable time is
saved by eliminating the bidding and redesign periods, and the owner
is not forced to coordinate between separate contracts and schedules,
as one team handles every aspect of the project. Responsibility
for the vast majority of your project is placed on us, rather than
on the owner, unlike traditional design-bid-build methods. We invite
you to benefit from our vast experience and allow us to perform
your next project as a “Total Project Solution” venture.
The Roberts Company Services

Benefits:
Cost Savings - Value engineering
and constructability are utilized continuously and more effectively,
because our construction estimators, project managers, designers,
and vendors work as one team during the entire design and construction
process.
Increased Efficiency – The
combined design-construction team enhances efficiency because the
design and construction parameters are being developed and evaluated
simultaneously with the budgetary goals. Owners also have greater
access to the project "team" as the project is being developed.
This efficiency is the keystone to the success of the Design-Build
model.
Quality -We are solely responsible for the completed
product and are motivated to build in quality throughout the design
and construction process.
Time Savings – Because design and construction
overlap, bidding periods and redesign are eliminated, thus significantly
reducing total project time. Typical conventional engineering/construction
contract arrangements require approximately 20% longer schedule
durations.
Reduced Owner Burden - You, the owner, do not have
to coordinate between separate contracts or resolve budget and schedule
conflicts, because we are your single source of contact throughout
the process.
Up-front Budgets - Construction costs are guaranteed
and known in advance compared to other delivery systems.
|