| Projects |
 |
 |
| 5 unit evaporator systems |
Plant installation |
 |
 |
| Heavy lifts |
Superheater installation |
 |
 |
| Tank stabilization programs |
Railcar sulfur unloading facility |
 |
 |
| Acid plant installation |
Large equipment replacement |
 |
 |
| Conveyor systems |
Conveyor systems |
 |
 |
| Woodyards |
4 unit evaporator system |
 |
 |
| Piping utility bridge installation |
electrical motor controlled center module
installation |
 |
 |
| 5 unit evaporator system ground floor
installation |
Structural steel erection in progress |
 |
 |
| Super heater tube bundle replacement |
Chemical plant modification in progress |
 |
 |
| Fabrication and erection of sulfuric acid
plant |
Completed 4 unit evaporator system installation |